All chapters

Phase 4 · Build · Chapter 09

Flooring, Walls & Ceiling Cladding

Build a sub-floor, screw ply walls into rivet-nutted ribs, and clad with tongue-and-groove or vinyl.

11 min read5 steps

Use thin, light, strong materials. Every kg you save in cladding goes back into payload for water, food and tools.

Premium · Guides

Read the rest of this chapter

Unlock the full step-by-step for this chapter and every other chapter in the field manual. Chapter 01 (Planning & Layout Design) is free as a preview.

  • · 5 numbered steps with material + tool callouts
  • · Curated "Buy the kit for this chapter" affiliate picks
  • · Linked regulations and safety notes
  • · Per-step photo uploads as you build

Was this useful?

Pay it forward.

VanBuildIQ is free and runs on word-of-mouth. If this chapter saved you a few hours (or a few hundred quid), share it where the next van-builder will find it.

https://vanbuildiq.co.uk/guides/flooring-walls-ceiling

Made with Emergent